Seminole Tribe of Florida Brighton Reservation Tribal Services Administration & Public Safety Complex
Zyscovich provided an exhaustive multi-departmental facility needs assessment, program analysis, and site assessment to develop a new administrative and public safety complex for the STOF Brighton Reservation. As part of developing the criteria for the design, performing the design analysis, and finalizing the program, various sites and conceptual massing studies were performed to determine the space and functional requirements. The following tasks were completed for the project as follows: programming, space design, space standards, assessment of existing conditions, planning and zoning criteria compliance, traffic engineering and design, cost estimating, topographic, boundary and detailed environmental and vegetation surveys, environmental analysis and abatement engineering, subsurface geotechnical testing and engineering, to mention some.